ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

EXPENDITURE CONTROL IN PUBLIC CONSTRUCTIONS OF THE DEPARTMENT OF PUBLIC BUILDING, FEDERAL CAPITAL DEVELOPMENT AUTHORITY, FCDA: A MANAGERIAL APPROACH

ABSTRACT

The conflict of competing stakes on limited available resources is obviously the

greatest challenge confronting the government of developing countries, thus, the quest for

effective management of public spending. Nigeria has as a panacea to economic

predicaments employed measures and to great extent adopted the World Bank reform tool

of Structural Adjustment. Better management of public spending including investment

programming are being sought through a process by which programmes are identified,

prepared, approved and implemented. Strengthening this process using the management

tools of monitoring and evaluation for control should lead to expenditure programmes

that are appropriately sized and better attuned to the overall development goals.

As construction works progress, most clients, especially Government Ministries,

Parastatals and institutions are compelled either to pay unbudgeted increase in building

project costs or abandon such projects.

This research seek to modestly contribute to identification of process of

implementation of public building construction programmes of the Department of Public

Building, Federal Capital Development Authority. The emphasis will be on management

of building construction programmes of the authority to ascertain the effectiveness or

otherwise of management of expenditure control.

The key to better management of public spending, including investment

programming, lies in the process by which programmes are identified, prepared,

approved and implemented. Strengthening this process should lead to expenditure

programmes that are a more appropriate size and are more attuned to overall development

goals.

Developing countries including Nigeria have a panacea to economic predicaments

employed measures and to greater extent adopted wholesale World Bank reform tools

such as Structural Adjustment, Lending Operations, Technical Assistance and Country

Economic and Sector Works.

As construction works progress, most clients, especially government ministries,

Parastatals and Institutions are compelled to either to pay unbudgeted increases in

building projects costs or abandon such projects outrightly.

This research seek to modestly contribute to identification of process of

implementation of public construction programme with the sole intent of examining

expenditure control. The Direct emphasis will be on effective management of public

expenditure in public constructions programmes of the Federal Capital Development

Authority by means of Expenditure Control.

TABLE OF CONTENT

Title page- – – – – – – – – i

Approval page – – – – – – – -ii

Dedication – – – – – – – – -iii

Acknowledgement – – – – – – – -iv

Abstract – – – – – – – – – -v

Table of content – – – – – – – -vi

CHAPTER ONE

INTRODUCTION – – – – – – – -1

1.0 Background of the study – – – – -1

1.1 Statement of the problem – – – – -5

1.2 Purpose of the study – – – – – -6

1.3 Significance of the study – – – – -8

1.4 Research questions – – – – – -9

1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39

Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60

Conclusion – – – – – – – – -61

Recommendations – – – – – – – -62

Suggestions for further research – – – – -64

References – – – – – – – – -65

Appendix I – – – – — – – – -68

Questionnaire. – – – – – – – -69

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *