ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

DETERMINATION OF ALKALINITY OF SACHET AND BOREHOLE WATER

ABSTRACT

Studies have shown that alkaline water helps neutralize acids in the body and allows for the free passage of substrate. The alkalinity of selected sachet and borehole water in Remo land were determined and the water samples were subsequently alkalised with the use of energy cup.

The untreated SW4 sachet water has the highest pH meter value of (7.2) and a pH colour chat value of (8.0) while the treated SW3 had a pH meter value of (9.9) and a pH colour chart value of (9.5) respectively.   The untreated borehole water samples of BW2 has the highest pH meter value of (6.0) and pH colour chat value of (6.0) while the treated BW1 and BW2 has the highest pH value of (9.2) each and pH colour chat value of (8.0) respectively.  The experiment however highlighted the high acidic content of SW2 for sachet water, with pH of (5.2) and BW2 for borehole water, with pH of (4.8), asserting the high acidic contents. Drinking such water could pose dangerous health risks to consumers of the water.

There is a need for the intervention of appropriate regulatory agencies to ensure production of high quality sachet waters which have the WHO standard pH of 6.5 to 8.5, although the normal pH of pure water should be 7.

TABLE OF CONTENTS

CHAPTER ONE

1.0     Introduction

1.1     Aim of research

1.2     Justification of research

CHAPTER TWO

2.0     Literature review

2.1     Health effects of water consumption

2.2     Sachet Water

2.3     Borehole Water

2.4     Alkaline Water

2.5     Energy Cup

CHAPTER THREE

3.0     Materials and Methods

3.1     Materials Used

3.2     Procedure

CHAPTER FOUR

4.0     Results

CHAPTER FIVE

5.0     Discussion, Conclusion and Recommendation

5.1     Discussion

5.2     Conclusion

5.3     Recommendation

References.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *