ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

AN EVALUATION OF MONETARY INTEGRATION IN THE ECONOMIC COMMUNITY OF WEST-AFRICAN STATES (ECOWAS)

ABSTRACT

Currency convertibility and monetary integration activities of the Economic Community

of West African States (ECOWAS) are directed at addressing the problems of multiple

currencies and exchange rate changes that are perceived as stumbling blocks to regional

integration. A real exchange rate (RER) variability model shows that ECOWAS is closer

to a monetary union now than before. As expected, the implementation of structural

adjustment programmes (SAPs) by various governments in the subregion has brought

about a reasonable level of convergence. However, wide differences still exist between

RER shocks facing CFA zone and non-CFA zone West African countries. Further

convergence in economic policy and alternatives to dependence on revenues from taxes

on international transactions are required for a stable region-wide monetary union in

West Africa.

TABLE OF CONTENT

Title page- – – – – – – – – i

Approval page – – – – – – – -ii

Dedication – – – – – – – – -iii

Acknowledgement – – – – – – – -iv

Abstract – – – – – – – – – -v

Table of content – – – – – – – -vi

CHAPTER ONE

INTRODUCTION – – – – – – – -1

1.0 Background of the study – – – – -1

1.1 Statement of the problem – – – – -5

1.2 Purpose of the study – – – – – -6

1.3 Significance of the study – – – – -8

1.4 Research questions – – – – – -9

1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39

Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60

Conclusion – – – – – – – – -61

Recommendations – – – – – – – -62

Suggestions for further research – – – – -64

References – – – – – – – – -65

Appendix I – – – – — – – – -68

Questionnaire. – – – – – – – -69

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *