ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR

YOU CAN CALL: 08068231953, 08137701720

WHATSAPP US ON: 08137701720

An evaluation of waste control measures in construction industry in Nigeria

ABSTRACT

Improper control of materials during different stages of construction has caused waste and associated environmental problems. Hence, this research assesses the forms, causes and factors incidental to waste and measures to effectively control construction waste. It is shown that among the factors incidental to waste, last minute client requirement was ranked highest as the factor that leads to design variation with relative importance index value of 3.97; cost of construction materials was ranked highest as a factor that affects selection of construction materials with relative importance index value of 4.05, and construction cost was ranked highest as the factor that leads to construction method with relative importance index value of 3.86. The research also showed that most of the firms do not calculate waste indices which could assist them to determine the amount of waste that could be generated on sites. Sorting exercise that could help firms to identify economy advantage associated with the waste streams is not adequately carried out. It was also discovered that most firms do not incorporate “waste management plan” into the collection of documents that are required of contracting firms during tendering process. To control waste, designers should be able to co-ordinate dimensions between materials specified during design and those procured for use at sites. There is need to allow proper control in the handling, storage and use of materials on site. Also, “waste management plan” should be incorporated as one of the documents dearly expected to be submitted by contracting firms during tendering process.

HOW TO RECEIVE PROJECT MATERICAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

projectgtaduates.com.ng

projectmarket.com.ng

projectschool.com.ng

projectstudent.com.ng

projectshop.com.ng

projectstores.com.ng

projectarena.com.ng

projectbases.com.ng

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *