ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR

YOU CAN CALL: 08068231953, 08137701720

WHATSAPP US ON: 08137701720

ASSESSMENT OF BUILDING MAINTENANCE IN NIGERIAN UNIVERSITY SYSTEM: A CASE STUDY OF UNIVERSITY OF NIGERIA, NSUKKA

ABSTRACT

Building  maintenance  involves  preserving  a  building  so  that  it  can  retain  its  economic  value  and  durability.

Maintenance is a very important aspect of facilities management that requires planning, because lack of maintenance

leads to serious economic loss. This research work was carried out to access the current state of maintenance of

public buildings in public institutions in Nigeria using the University of Nigeria, Nsukka as a case study. It also proffers

solutions to maintenance problems. The field investigation focused on staff residential houses, students’ hostels,

offices and classrooms. Questionnaires were used to collate data/information on 500 residential apartments, offices

and a total of 260 hostel rooms were examined. The results were analyzed statistically. The results show that about

80% of the buildings within the University require immediate maintenance. Maintenance works are also needed at the

staff residential buildings, students’ hostels, offices and classrooms. They are also needed in the plumbing works,

bathrooms, toilets, doors, windows, the painting, walls, floors, roofs and electrical installations of the buildings.

74.60%  of  the  residential  buildings  need  roof  maintenance,  57.30%  need  floor  maintenance,  60%  need  wall

maintenance, 71.30% need re-painting, and 68.60% need window maintenance.  In the students hostels, 61.70% of

the hostels need door maintenance, 59.50% need to have their toilet facilities maintained while 72.40% of the hostels

need to have their plumbing works maintained. It is concluded that lack of maintenance policy and funding is the

major cause of public building deterioration in University of Nigeria, Nsukka. It is recommended that a holistic

maintenance framework should be adopted in line with International best practices in developed countries. In

addition, the University should adopt preventive maintenance policy by employing outsourcing maintenance services.

The University should also introduce the use of one stop shop maintenance services including the use of information

and communication technology.

HOW TO RECEIVE PROJECT MATERICAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

projectgtaduates.com.ng

projectmarket.com.ng

projectschool.com.ng

projectstudent.com.ng

projectshop.com.ng

projectstores.com.ng

projectarena.com.ng

projectbases.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *