ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

CONSTRUCTION OF 500 LITERS WATER CAPACITY TANK

TABLE OF CONTENTS

Cover page               –       –       –       –       –       –       –       i

Title page         –       –       –       –       –       –       –       –       ii

Approval page –       –       –       –       –       –       –       –       iii

Dedication       –       –       –       –       –       –       –       –       iv

Acknowledgement    –       –       –       –       –       –       –       v

List of tables    –       –       –       –       –       –       –       –       vi

Abstract   –       –       –       –       –       –       –       –       –       vii

Table of contents     –       –       –       –       –       –       –       viii

CHAPTER ONE

1.0      INTRODUCTION      –       –       –       –       –       –       1

1.1      Background of the Study         –       –       –       –       1

1.2      Specifically the Objectives of the study are      –       5

1.3      Justification of the Study         –       –       –       –       5

CHAPTER TWO

2.0      LITERATURE REVIEW           –       –       –       –       7

2.1      Definition of Erosion        –       –       –       –       –       7

2.2      Water Erosion –       –       –       –       –       –       –       11

2.3      Raindrop Erosion or Splash Process        –       –       12

2.4      Surface Flow Erosion Process –       –       –       –       24

2.4.1Sheet Erosion –       –       –       –       –       –       16

2.4.2Interill Erosion         –       –       –       –       –       16

2.5      Gully Erosion   –       –       –       –       –       –       –       17

2.6      Factors Affecting Soil Erosion     –      –      –      18

2.6.1               Erodibility      –      –      –      –      –      –      19

2.6.2               Erosivity-      –      —     –      –      –      –      21

2.6.3Topography      –       –       –       –       –       –       22

2.7      Soil conservation     –       –       –       –       –       –       22

2.8      Approaches to soil conservation      –       –       –       24

2.9      Soil Stability    –       –       –       –       –       –       –       25

CHAPTER THREE

3.0      MATERIALS AND METHODLOGY –       –       –       27

3.1      Area of study    –       –       –       –       –       –       –       27

3.2      Materials Used         –       –       –       –       –       –       28

3.3      Soil Test   –       –       –       –       –       –       –       –       29

3.3.1        Plastic Limit     –       –       –       –       –       –       30

3.3.2        Liquid Limit     –       –       –       –       –       –       33

3.3.3        Grain Size Analysis –       –       –       –       –       36

3.3.4        Moisture Content     –       –       –       –       –       40

3.3.5        Shear Strength-       –       –       –       –       –       42

3.4      Soil Loss Determination   –       –       –       –       –       47

CHAPTER FOUR

4.0      RESULTS AND DISCUSSION –       –       –       –       56

4.1      Results    –       –       –       –       –       –       –       –       56

4.2      Discussion       –       –       –       –       –       –       –       56

4.2.1Erodibility Determination        –       –       –       58

4.2.2Precipitation    –       –       –       –       –       –       61

4.2.3Relating Slope To Erosion        –       –       –       –       62

CHAPTER FIVE

5.0      CONCLUSION AND RECOMMENDATION       –       63

5.1      Conclusion

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *