ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR

YOU CAN CALL: 08068231953, 08137701720

WHATSAPP US ON: 08137701720

ECONOMIC EFFICIENCY OF RESOURCE USE AMONG URBAN WATERLEAF FARMERS IN AKWA IBOM STATE, NIGERIA

ABSTRACT

The study estimated the efficiency of resource use among urban waterleaf farmers in Akwa Ibom State using a sample of 60 respondents that were randomly selected (20) from three urban centers in the state. Interview schedules and structured questionnaires were administered to elicit information from the respondents. Data were analyzed using descriptive statistics, multiple regression and gross margin. The results showed that, most (85%) farmers were within the economically active age bracket (21-50yrs). All the farmers were female with a mean house hold size of eight. Majority (90%) of the farmers were literate with a mean farming experience of 8.5 years. The average farm siz  was 0.065ha, and waterleaf was planted as a sole crop to obtain high output. The multiple regression analysis showed that educational level, household size, farming experience, quantity of manure, labour and farm size positively and significantly influenced the output of waterleaf in the study area. The efficiency ratios of farm size (28.68), manure (42.11) and labour (0.91), showed that waterleaf farmers were inefficient in the use of these resources. Land resource and manure were underutilized, while labour was over- utilized. Gross margin analysis showed that farmers made profit (Gross margin = N 287,252.52 per hectare). Lack of access to credit facilities was the farmer’s major constraints. It is therefore recommended that credit facilities should be provided to the urban farmers, and extension agent should take advantage of the literate farmers to disseminate research information

HOW TO RECEIVE PROJECT MATERICAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

projectgtaduates.com.ng

projectmarket.com.ng

projectschool.com.ng

projectstudent.com.ng

projectshop.com.ng

projectstores.com.ng

projectarena.com.ng

projectbases.com.ng

projectwisdom.com.ng

projectsense.com.ng

projecttorch.com.ng

projectlamp.com.ng

projectmentor.com.ng

projectteacher.com.ng

projectjunction.com.ng

projectstop.com.ng

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *