ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

INVENTORY MANAGEMENT IN MANUFACTURING INDUSTRIES: A CASE STUDY OF ELECTRICITY METER COMPANY NIGERIA LIMITED, ZARIA

ABSTRACT

This project presents the inventory planning and control systems in use in Electricity Meter Company Nigeria Limited, Zaria. A questionnaire was designed to gather necessary data which was complemented with other methods of gathering facts such as interviews, observations, etc. The project was aimed at examining the extent to which

inventory management theories have been implemented and to what extent it has worked in practice. It also aimed at providing useful suggestions for improvements in line with the findings of the study. Towards this aim, some inventory management practices such as forecasting methods, inventory models and the application of computers were discussed. The study revealed that intuition and historical experience rather than any scientific methods are in use in the company’s inventory management practices. Problems militating against the company inventory management practices include the hard economic situation in the country, difficulty in procuring foreign exchange for the importation of raw materials, and difficulty in determining optimum order quantities. Consequently, it is recommended that efforts should

TABLE OF CONTENT

Title page- – – – – – – – – i

Approval page – – – – – – – -ii

Dedication – – – – – – – – -iii

Acknowledgement – – – – – – – -iv

Abstract – – – – – – – – – -v

Table of content – – – – – – – -vi

CHAPTER ONE

INTRODUCTION – – – – – – – -1

1.0 Background of the study – – – – -1

1.1 Statement of the problem – – – – -5

1.2 Purpose of the study – – – – – -6

1.3 Significance of the study – – – – -8

1.4 Research questions – – – – – -9

1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39

Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60

Conclusion – – – – – – – – -61

Recommendations – – – – – – – -62

Suggestions for further research – – – – -64

References – – – – – – – – -65

Appendix I – – – – — – – – -68

Questionnaire. – – – – – – – -69

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *