ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

MANPOWER PLANNING AND DEVELOPMENT A CASE STUDY OF PEUGEOT AUTOMOBILE NIGERIA LIMITED KADUNA FROM 1989-1998

ABSTRACT

The project is the study of Manpower Planning and Development vvitli Peugeot Automobile Nigeria limited as a case study. More specifically, concerned with the following i) Determinations of the existing staff levels, staff strength and staff turnover rate of the organisation. ii) Examination of Manpower Planning and Development policies of the organisation which was found to be suitable in coping with the organisational manpower needs. iii) Examination of how Manpower are developed in the organisation. The organisation vigorously pursue its Manpower Development policies plan despite some difficulties through the utilization of both its Training Centre, tertiary institution within the country and the sponsorship of personnel to attend training programme outside the country. iv) Analyses of the manpower planning and development of the organisation which was found to have high rate of staff turnover rate thereby resulting to an enormous waste of resources. VIIj And vital suggestions and recommendation such as: – the improvement of the frequency of training programme for staff; – reorganization of the organization’s employment programme using the assistance of a statistician – and the formulation of manpower planning and development policies that will contain manpower forecasting and wastage analysis . These when applied will prevent any shortage of manpower presently and in the future.

TABLE OF CONTENT

Title page- – – – – – – – – i

Approval page – – – – – – – -ii

Dedication – – – – – – – – -iii

Acknowledgement – – – – – – – -iv

Abstract – – – – – – – – – -v

Table of content – – – – – – – -vi

CHAPTER ONE

INTRODUCTION – – – – – – – -1

1.0 Background of the study – – – – -1

1.1 Statement of the problem – – – – -5

1.2 Purpose of the study – – – – – -6

1.3 Significance of the study – – – – -8

1.4 Research questions – – – – – -9

1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39

Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60

Conclusion – – – – – – – – -61

Recommendations – – – – – – – -62

Suggestions for further research – – – – -64

References – – – – – – – – -65

Appendix I – – – – — – – – -68

Questionnaire. – – – – – – – -69

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *