ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR

YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON: 08168759420

THE EFFECT OF STORAGE METHODS ON EGG QUALITY AND ORGANOLEPTIC PROPERTIES OF BROWN EGG TYPE OF DOMESTIC FOWL IN AKWA IBOM STATE.

TABLE CONTENTS

Approval page

Dedication

Abstract

Acknowledgement

CHAPTER ONE

INTRODUCTION

1.1 Relevance of project

1.2 Site inspection

1.3 Evolution of road network in nigeria

1.4 Motor vehicle characteristic that affects road design data

1.5 Drivers and their characteristics

1.6 Reconnaissance survey

1.6.1Chain survey

1.6.2Station marking

1.7 Factors Affecting Choice Of Station

CHAPTER TWO

THEODOLITE TRANSVERSING OF THE ROAD CONTROL

2.1 Definitions

2.2 Thetheodolite

2.3 Theodorite adjustment

2.3.1Temporary adjustment

2.3.2Permanent adjustment

2.4 Procedure for theodolite traversing

2.5Materials used for the theodolte traversinging

CHAPTER THREE

PROJECT FIELD LEVELING WORK

3.1 Leveling

3.2 Profile leveling

3.3 Cross leveling

3.4 Objectives of leveling

3.5 Instruments used in leveling

3.6 Temporary adjustment of leveling instrument

3.7 Definition of some leveling terminologies

3.8 Leveling book

3.9 Earthwork computation

3.9.1Method

CHAPTER FOUR

SOIL ANALYSIS

4.1 Collection and preliminary preparation of samples

4.2 Mechanical analysis

4.3 Atterberg/consistency limit tests

4.3.1Liquid limit test

4.3.2Plastic limit test

4.4 Compaction test

4.5 The California bearing ratio (cbr) test

4.6 Pavement design using cbr

CHAPTER FIVE

GEOMETRIC ELEMENTS DESIGN

5.1 Basic design parameters

5.1.1Design speed

5.1.2Gradient

5.1.3Sight distance

5.2 Curve design

5.3 Curve parameters and formula used, in designing of horizontal curves

5.4 Vertical curve design

5.5 Cross sectional elements of the road

5.6 Brief description on stages of work and equipment used n road constriction

5.7 Summary and conclusion

Bibliography

HOW TO RECEIVE PROJECT MATERICAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *