ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

THE IMPACT OF TRANSPORTATION IN THE TOURISM INDUSTRY

ABSTRACT

The project focused on the roles of transportation in tourism industry as it described the benefits that will be gained from tourism in the country provided the transport system in well developed. This project work covers area such as the definitions of tourism and transportation, the relationship between transportation and tourism, elements of transportation, modes of transportation, importance of transportation in Nigeria and its roles in tourism industry. The method used in carrying out the research were questionnaire administration and personal observation. Recommendation includes the development of the transport modes in the country, publicity about the tourist sites through the use of A-Z brochure about tourist sites in Nigeria provision of infrastructures and superstructures to tourist sites. Private sectors should likewise participate. In the development of transportation. Holiday relief should be given to the working population of the country to participate in tourism.

TABLE OF CONTENT:

CHAPTER ONE

INTRODUCTION

1.1     Background of the Study

1.2     Statement of the Research Problem

1.3     Objectives of the Study

1.4     Significance of the Study

1.5     Research Questions

1.6     Research Hypothesis

1.7     Conceptual and Operational Definition

1.8     Assumptions

1.9     Limitations of the Study

CHAPTER TWO

LITERATURE REVIEW

2.1     Sources of Literature

2.2     The Review

2.3     Summary of Literature Review

CHAPTER THREE

RESEARCH METHODOLOGY

3.1     Research Method

3.2     Research Design

3.3     Research Sample

3.4     Measuring Instrument

3.5     Data Collection

3.6     Data Analysis

3.7     Expected Result

CHAPTER FOUR

DATA ANALYSIS AND RESULTS

4.1     Data Analysis

4.2     Results

4.3     Discussion

CHAPTER FIVE

SUMMARY AND RECOMMENDATIONS

5.1     Summary

5.2     Recommendations for Further Study

References

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *