ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

TRENDS IN THE ACTIVITIES OF THE MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT

This study evaluated the impact of the extension services of Green River Project (GRP) on fish

farmers in Niger Delta, Nigeria. Specifically, it sought to ascertain fishery technologies received

by GRP fish farmers; determine adoption of fish farming technologies by fish farmers; determine

impact of extension services of GRP on socioeconomic condition of the fish farmers as at the

year 2012; ascertain farmers’ perceived constraints to adoption of GRP fish farming

technologies; ascertain constraints to effective performance of extension services of GRP and

determine perceived strategies to improve effectiveness of the extension services of GRP. The

study was carried out in Niger Delta, Nigeria. Multi-stage sampling technique was used to select

120 fish farmers and 20 GRP personnel. Data were collected through the use of questionnaire

and interview schedule. Descriptive statistics (frequency, mean statistic, percentage) were used

to present data while t-test, regression, chi-square and factor analysis with varimax rotation were

used to analyze the data. Mean age of GRP fish farmers and personnel were 50 and 41.70 years,

respectively. Majority (76.7% of fish farmers and 65% of GRP personnel) of respondents were

male.”

Also majority (77.5%) of the fish farmers and all (100%) the GRP personnel were married.

The respondents were literates. Majority (70.0) of the fish farmers also engaged in other income

generating activities. Average household size of the fish farmers and GRP personnel were 6.0

and 4.0 persons, respectively. Average years of participation in GRP for the fish farmers was

8.00 years while the mean years of working with GRP of the personnel was 12.65years. The

farmers’ average number of contact with GRP was 4.0 times per month. GRP personnel used

different types of teaching methods such as the use of contact group (100%), T&V system (90%)

and SPAT (85.0%). Majority (86.7%) of the fish farmers belonged to social organisations.

Majority of respondents received most of the technologies disseminated. Adoption index of fish

farm management technologies, feeding techniques, fish culture management technique, water

quantity and quality management techniques and liming techniques were 0.79, 0.77, 0.77, 0.88

and 0.52 respectively. Extension services of GRP had impact on quantity of fingerlings stocked

(t=6.398; p≤ 0.05) and quantity of fishes harvested (t=6.279; p≤ 0.05); income from fishes

produced (t=7.390; p≤ 0.05) among others. Constraints to adoption of GRP technologies were

grouped into technology dissemination constraints; project implementation and sustainability

constraints among others. Some socioeconomic characteristics of the respondents (age (years),

years spent in formal education and years of participation in GRP) influenced the adoption of the

fish farming technologies. Therefore, the null hypothesis was rejected for these variables. There

was significant difference between the average quantities of fish stocked and average quantity of

fish harvested by the fish farmers in Imo and Rivers States after participation in GRP hence the

null hypothesis was rejected. The null hypothesis was rejected while the alternative hypothesis

was accepted. It further revealed that there was no significant difference between the average

income earned by the fish farmers in Imo and Rivers States after participation in GRP and the

null hypothesis was accepted. Implementation constraints to effective performance of extension

services of GRP according to GRP personnel included: climatic uncertainties and flooding (M=

1.55) and delay in input supply (M=1.20). It was recommended that there is need to increase

youth involvement in the project (90.0%), increase farmers’ participation in decision making

(90.0%) and increase the number of trained extension personnel (85.0%).

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *